Construction by Neighbourhood
Neighbourhoods are listed in alphabetical order. If your isn't listed, there may be no major, disruptive maintenance projects scheduled. However, you may see City of Red Deer vehicles in your neighbourhood for unexpected or small repair work.
Check the Traffic Disruptions Map to find out more about work underway in your neighbourhood.
Neighbourhood | Project Type | What to Expect | Estimated Date * |
---|---|---|---|
Anders | |||
Allsop Avenue rear lanes | Underground utility repair and replacement. This includes water, sanitary and storm utility infrastructure. | Rear lane access disruptions | TBD |
|
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Capstone/Cronquist | |||
54 Ave Extension | Deep utilities will be installed; surface work will be completed in 2026 | Minimal impact | TBD |
45 St to 55 Ave Location map (pdf) |
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Downtown | |||
47 St lane - 47 St to endLocation map (pdf) | Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
49 St - 49 Ave to 48 Ave Location map (pdf) |
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Rotary Park Water Vault | Underground utility repair and replacement. This includes water, sanitary and storm utility infrastructure. | Brief closure to nearby trail, likely 3-4 days. | Work begins July 1* |
Spruce Drive House demolition | Demolition of derelict property |
Abatement assessment mid-April, demo contract to be issued and completed over the summer |
TBD |
Empire Building demolition |
Demolish existing building including foundations and site service disconnections. Includes land reclamation. |
Traffic disruptions and reduced access | TBD |
Evergreen | |||
30 Avenue from roundabout to Evergreen entrance | Street light installation | Street lights will be installed to improve lighting for both motorists and pedestrians along 30 Ave. Minor traffic disruption as underground utilities, poles are installed. | TBD |
Glendale | |||
|
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Grandview | |||
|
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Kentwood | |||
|
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Michener | |||
51 Street Close lanes Location map (pdf) |
Underground utility repair and replacement. This includes water, sanitary and storm utility infrastructure. | No access to rear lanes throughout the duration of the project. | Late April / early May - October |
Oriole Park | |||
Orr Drive - Oldford Cl to Osler Cres Location map (pdf) |
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Pines | |||
Gaetz Avenue Utility ROW from Phelan St to 76 Street | Underground utility repair and replacement. This includes water, sanitary and storm utility infrastructure, in the utility right-of-way. | Minimal disruptions | Late April / early May - October |
Riverside Meadows | |||
CPR Bridge Project | Rehabilitation of the iconic and historic CPR Pedestrian Bridge spanning the Red Deer Driver | Trail closures, no access to the bridge until August 2026. | Winter 2025 - Fall 2026 |
Infrastructure Revitalization Project | ongoing | ||
South Hill | |||
38 St & 39 St between 52 Ave & 51 Ave | Utility servicing | TBD | |
West Park | |||
Walker Blvd - Cronquist Dr to Webster Dr. Location map (pdf) |
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
*Note: dates are weather dependent, and subject to change. Please refer to the Traffic Disruptions Map for current operations.
Major Roadways | Project Type | What to Expect | Estimated Date * |
---|---|---|---|
Downtown:
|
Traffic signal infrastructure replacement | Minor disruptions during traffic signal changeover | TBD |
30 Ave & 22 St intersection Location map (pdf) |
Intersection improvements | Construction of new left turn lanes on 22 St; intersection disruptions | April-July |
30 Ave & 32 St intersection Location map (pdf) |
Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
30 Ave & Carrington Dr | Intersection improvements | Installation of an additional left turning lane from northbound 30 Ave, turning onto Carrington Dr. | May-Aug |
Taylor Drive & 32 St | Road rehabilitation - asphalt resurfacing | Brief traffic disruptions and reduced access | TBD |
Taylor Drive North - Edgar Industrial Dr to 77 St Location map (pdf) |
Micro-surfacing | Reduced speeds, alternating lane closures | TBD |
Taylor Dr south – Kerry Wood Drive to 43 St Location map (pdf) |
Micro-surfacing | Reduced speeds, alternating lane closures | TBD |
Taylor Dr south – 43 St to 32 St & 32 St to 19 St Location map (pdf) | Micro-surfacing | Reduced speeds, alternating lane closures | TBD |
*Note: dates are weather dependent, and subject to change. Please refer to the Traffic Disruptions Map for current operations.