Construction by Neighbourhood

Neighbourhoods are listed in alphabetical order. If your isn't listed, there may be no major, disruptive maintenance projects scheduled. However, you may see City of Red Deer vehicles in your neighbourhood for unexpected or small repair work. You can always check the Traffic Disruptions Map to find out more about work underway.
Neighbourhood Project Type What to Expect Estimated Date *
Anders
Alberts Close laneways Road repair Rear alley cart collection will be rerouted during road repair work TBD
Various locations Catch basin & lead replacement To address heaving action observed in catch basins during winter, work includes removing and replacing catch basins, manholes, and leads, apply frost treatments and restoring sites. 
Work causes minor disruptions.
TBD
Various locations Raised Manhole Adjustments As road settles, manhole needs to be lowered to be made level with road. Work causes minor disruption to motorists & pedestrians.  
Bower
Barrett Drive from Bower Place east entrance to Bettenson St. Road repair Road closures and bus detours as road is repaired. Estimated time is 3-6 weeks.  
Capstone/Cronquist
54 Ave & 47 Street, adjacent to Carnival Cinemas Street light installation Old street lights will be replaced to improve lighting for both motorists and pedestrians. Very minor disruptions. TBD
Downtown
49 Street from 49 Ave to 48 Ave Underground Utility repairs Road Closure April
47 Ave from 55 St to 53 St Underground Utility repairs Road Closure April
Evergreen
30 Avenue from roundabout to Evergreen entrance Street light installation Street lights will be installed to improve lighting for both motorists and pedestrians along 30 Ave. Minor traffic disruption as underground utilities, poles are installed. TBD
Grandview
43 Ave & Ross St Underground water, sanitary and stormwater infrastructure upgrades as well as electrical utility upgrades. Learn more about the full project.   April to October, 2024
Highland Green
Various locations Catch basin & lead replacement Addresses heaving action observed in catch basins during winter. Work includes removing and replacing catch basins, manholes, and leads, apply frost treatments and restoring sites. Work causes minor disruptions.  
Kentwood
Various locations Catch basin & lead replacement Addresses heaving action observed in catch basins during winter. Work includes removing and replacing catch basins, manholes, and leads, apply frost treatments and restoring sites.  Work causes minor disruptions.  
Morrisroe
Munro Crescent laneway from Mackenzie Crescent to Martin Close Phase 2 Utility Upgrades    
Munro Crescent laneway from Mackenzie Crescent to Martin Close Phase 1 EL&P Upgrades:  Crews installing new conduits and changing out transformers which requires boring holes along utility ROW Residents will experience limited access to rear lanes. Construction hours will adhere to the community standards bylaw for noise (7 a.m.- 7 p.m. Monday to Saturday) Occasionally, crews may need to access and/or disturb portions of private property to access infrastructure. If your property is affected, you will be notified by the project manager directly. If this is the case, your property will be restored after work is completed.   May - Sept
39 Street from Maxwell Ave to 30 Ave Street lights will be replaced to improve lighting for both motorists and pedestrians along the boulevard.   30 Ave will be reduced to one lane during portions of the work. Walking path along 30 Ave will affected as a trench is created to access underground utilities. TBD
Marion Cres & Manning St from Maxwell Ave to Manning St New sidewalk installation in front of homes Removing sidewalk adjacent to and in front of driveways. Wood-forms to mold the poured concrete will be in place. TBD
Pines
Gaetz Avenue and Parke Avenue from Phelan Street to 74 Street Electric utility upgrades in the utility right-of-way between   Very minimal disruptions TBD
Riverside Meadows
CPR Bridge Project      
Infrastructure Revitalization Project      
Kerrywood Drive from Taylor Drive to Gaetz, along the bridge Electric utility upgrades   TBD
Rosedale Meadows
  Residents may notice work on the old farm on the other side of 20 Avenue. These buildings are being demolished and land is being reclaimed mid-summer   June/July
Timberlands North
Thorburn St from 67 Street to Townsend Ave Extension of sanitary and water services to the multi-family site Road closures will be implemented from April to June April-June
Vanier
Various locations Raised Manhole Adjustments As road settles, manhole needs to be lowered to be made level with road. Work causes minor disruption to motorists & pedestrians.  
West Park
Cronquist Drive/43 Street from 60 Ave to south of 54 Ave Overhead electricity lines are being rebuilt along this roadway Should be minor disruptions April to fall
Various locations Catch basin & lead replacement Addresses heaving action observed in catch basins during winter. Work includes removing and replacing catch basins, manholes, and leads, apply frost treatments and restoring sites. Work causes minor disruptions.  
Various locations Raised Manhole Adjustments As road settles, manhole needs to be lowered to be made level with road. Work causes minor disruption to motorists & pedestrians.  

*Note: dates are weather dependent, and subject to change. Please refer to the Traffic Disruptions Map for current operations.

Major Roadways Project Type What to Expect Estimated Date *
Ross St. & 43 Ave (Ross St. hill) Underground infrastructure upgrades Lane closures, detours throughout June - Sept
22 St from Austin Drive to Save-on entrance Road repair, sidewalk & curb/gutter repairs Lane closures April/May
Riverside Drive from 67 Street to 49 Avenue Road repair Repairs may range from simple pavement strengthening to full re-construction August
40 Ave northbound from 39 Street to McBride Crescent Road repair Repairs may range from simple pavement strengthening to full re-construction  

*Note: dates are weather dependent, and subject to change. Please refer to the Traffic Disruptions Map for current operations.